G
Guest
Guest
We need a few things to make BAYMAC run smoothly. If you have any of these please chime in, we'd be extremely grateful
We need:
2 to 3 wheeled Brute trash cans
2 to 3 siphon hoses
2 - sump pumps with 50' - 100' hose (to drain tanks)
6 - 200w heaters (or more)
3 - 50amp job site power distribution center (Hook is loaning one of these and I may have a line on a second)
2 - 100' 50amp cords (cali twist end style) (Hook is loaning 1 80-100' cord, I may ahev a line on a second 100')
1 - 30' 30amp cord
4 or more - walk about radios
We need:
2 to 3 wheeled Brute trash cans
2 to 3 siphon hoses
2 - sump pumps with 50' - 100' hose (to drain tanks)
6 - 200w heaters (or more)
3 - 50amp job site power distribution center (Hook is loaning one of these and I may have a line on a second)
2 - 100' 50amp cords (cali twist end style) (Hook is loaning 1 80-100' cord, I may ahev a line on a second 100')
1 - 30' 30amp cord
4 or more - walk about radios