High Tide Aquatics

180 CDA build

Some one say plumbing ?

image.jpg
 
All 3 bulk heads for the modular marine overflow down pipes (1.5”) have defective gaskets, around 1/3 of the way in the gasket is thinner or torn on all 3, prob fine but easier to fix it now the deal w leaks later. The included 2 2” bulkhead gaskets were flawless.

Also looking for some 3d printed power brick holders, I know they are on line but I figured someone on here has a side hustle? Need 5 xr30-g6, vectra l2 and 4xmp40s


IMG_6087.jpeg
IMG_6088.jpeg
 
Back
Top