High Tide Aquatics

Life Update!!

Hey all, working on closing on a house and life has gotten 10x crazier within the last few days. If you've placed a order and I have spaced I 100000% apologize. Getting a house is more than I assumed in terms of work load/stress. If you are trying to order and don't hear back within 24 hours don't hesitate to ping me again. I still plan to operate as normal when moving homes and changing jobs.
 
Another update!

Everything has been going pretty smooth however I did need to do a long escrow due to lab changes. Signing the title on Wednesday and then closing 2.10 for a move in eta near 2.14 (I offered rent back to butter up to the sellers lol) and once that starts we will begin build out of Coral Hub U.S. v2!

I’ll continue operation as normal as possible as we plan on doing it in stages. But as always don’t be afraid to message twice if you feel like I missed your message. As always I appreciate everyone’s support!
 
Back
Top