Cali Kid Corals

Check out this build I am working on...

Wow, what a project!
I get a kick out of the bridge you had to make to get things in.
Seems very well planned and executed.

Except ... a hole in the very bottom of a big tank, that goes to a rather weak looking U-joint?
View attachment 28105
Must have been a Monday.

It’s hard to tell from the pictures but it’s actually pretty well supported. That is just a water change drain line that’s connected to a 1.5” SCH 80 bulkhead and also strapped at multiple points on the bottom of the shelf. And, at the terminal point, it’s also bulkheaded to the concrete slab.

Also, if if both the gate valve and ball valve failed due to wear and tear, the whole assembly can still be replaced by plugging the other end of the bulkhead with a threaded plug therefore avoiding unnecessary tank drain.

BTW...this is actually for another system I am also building.
 

Attachments

  • 780FEF0E-9961-4F33-8205-B9D6B0894080.jpeg
    780FEF0E-9961-4F33-8205-B9D6B0894080.jpeg
    114.1 KB · Views: 256
  • D498EEC5-CBE9-4473-B114-11F54D438221.jpeg
    D498EEC5-CBE9-4473-B114-11F54D438221.jpeg
    95.9 KB · Views: 257
  • 0A069A47-42B4-4C2F-AF43-ECE92886C311.jpeg
    0A069A47-42B4-4C2F-AF43-ECE92886C311.jpeg
    53.2 KB · Views: 249
Last edited:
It’s hard to tell from the pictures but it’s actually pretty well supported. That is just a water change drain line that’s connected to a 1.5” SCH 80 bulkhead and also strapped at multiple points on the bottom of the shelf. And, at the terminal point, it’s also bulkheaded to the concrete slab.

Did you sleeve the pipe with a barrier from the cement? Some call it a “chase”?
 