Option D is in full effect! More on what this is after everything is actually assembled though
Ok so all the wood joists on one side of the room have been removed, option D allows for an easier rerouting of power so I can go 12-3 and share a neutral so I get 2-20amp circuits dedicated to the tank. I do need to create a bulkhead due to a heater vent that will inconveniently be right over the tank as I really don't want any noises coming up and I'm going to be sure to use plenty of sound proofing insulation between it and the tank.
Decided to go straight to the concrete slab and deal with the sloped floor as it is, the slope is by no means major, but if you put a ball down it will roll towards the floor drain.
Laid down about 30 square feet of tile, all of a sudden remembered the back pain from when I did my bathroom some 7 or so years ago (plus I'm 7 years older and more wussified) Advil and a hot shower seemed to help though. Decided to do tile directly under the tank plus a little overhang, then some engineered flooring the rest of the way, after today I'm glad I went that route because 30 square feet would be less than a tenth of the room, and I'd hate to think about doing what I did 10 times longer.
So the plan now is to.
- Finish up the tiling (edges) plus a few pieces I need to cut. This might happen next weekend
- Reroute power. Could happen anytime this week if I get motivated.
- Install ventilation. Ditto
- Put up drywall. Still working on this since a sheet of drywall won't fit in the Prius
- Build bulkhead around heater vent. Again could happen this week
- Build stand
- Move sump
- Buff out sump
- Move Tank
- Buff out tank
- Figure out if I want to use closed loops or weld-on them shut.
- Finish up "canopy" part
- Get water in the tank and start the cycle
- Move fish/corals over (saw planeria kicking up again in my coral tank *grrrr*)
- Rip out OTHER half of the room
- Reroute water pipes
- Make wife happy by getting laundry area cleaned up and never again using machines as place to put fish related stuff
- Put in flooring
- Relaxation and hope it all works out fine with a cold one in my hand.